PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out gravel between column lines A-C.7, 4-3 Facing East (800x600).jpg Stripped the trench drain forms Facing South-West (800x600).jpg Finished installing metal stair -2 (4th Floor) Facing South-West (800x600).jpg Installed elevator beams at Elev. 1,2,3 (2nd Floor) Facing North-West (800x600).jpg Installed metal decking at Derrick 4 (Roof) Facing West (800x600).jpg